Providing Innovative Design and Deployment of Optical Fiber and Copper Infrastructures
Services
Providing custom tailored network designs that exceed the present day and prepare for day two IT requirements.
​
​
Passive Optical LAN Design

​
-
Discovery of client requirements to determine best approach
-
Point to Multi-Point (P2MP)
-
active ethernet Point to Point (P2P)
-
hybrid P2P & P2MP
-
-
Create design and drawings
-
Send to the factory floor
-
Assemble, certify, and package (2 weeks)
-
Ship kit to site for installation (1 week)
-
Integrator installs layer one 60% faster than traditional approach
-
Integrator commissions layer two
-
Integrator provides end user training
Strucutred Zone Copper

-
Discovery of the client requirements to determine zone density
-
square foot per person calculation
-
25% future drops per zone
-
-
Create design and drawings
-
Send to the factory floor
-
Assemble, certify, and package (2 weeks)
-
Ship kit to site for installation (1 week)
-
LV contractor installs typically 60% faster than traditional methods
-
Used with a low profile raised floor install is 80% faster than traditional methods
Centralized DC Power

-
Discovery of client requirements for uptime of network resources
-
controlled switch over to genset 15min typical
-
-
Determine best DC solution for the application
-
Corning DE/PSU6
-
Alpha
-
Low Profile Access Flooring
Height Adjustable 2.5" to 3.5"

Height adjustable low profile access flooring provides the perfect technology platform for network cabling and the ultimate environment for an ultra fast installation that eliminates the need for expensive cable trays and ladders during installation.
​
Using a low profile technology platform saves in multiple ways. Vastly reduces the requirement for costly core drills and eliminates the need for unsightly power poles. Cabling costs can also be reduced by using non-plenum rated category copper materials. Reducing raw cable costs by 30% and installation is simple lay-in approach with no ladders needed that typically installs 80% faster than traditional approaches.
Modular Electrical System

COMING SOON
Project Management
Day one to completion

We will be representing you through all phases of design, delivery and commissioning to insure 100% satification.